Generali façade in Piazza dei Navigatori with a spider lift during OPERA's works

Piazza dei Navigatori / Rome

Generali

Category
Commercial spaces
Type
Offices · Fit-out
Scope of work
Complete refurbishment
Duration
about 3 months

The project

Complete refurbishment of an office area for more than 30 workstations and training spaces. OPERA managed the project from demolition to finishes, coordinating the various trades through to handover.

The work

Demolition · Masonry · False ceilings · Glazed partitions · Electrical and mechanical systems · Flooring · Finishes

The detail

Completed illuminated staircase with metal steps and integrated LED lighting
Staircase detail during the works, with tools in view
Work in progressThe staircase during the finishing works.

The site

OPERA team installing the large glazed wall
HandlingInstalling the large glazed wall, with the team at work.

The result

Completed office space with red wall, grid ceiling and circular diffuser

Building the spaces

Office corridor during the works with grid ceiling

The offices

Completed offices with glazed partitions, red wall and grid ceiling
Office during the final works and fit-out
Fit-outFinal stage and handover of the spaces.

Training room

Completed training room with seating and grid ceiling

The corridor

Completed corridor with glazed walls and natural light in perspective